Company History

2024: Began importing and selling air-conditioned clothing.
2024 Completed plant renovation.
2023 Started manufacturing automotive modules.
2022 Established post-process assembly line.
2018 Began production of MOBILITY products.
2017 Introduced internal automated production line.
2017 Expanded ODM product sales.
2016 Installed automotive production line and clean rooms.
2015 Began establishing an automated production line.
2015 Obtained IECQ QC080000 certification.
2011 Started production of DC/DC converters.
2010 January: Obtained QC 080000 certification.
2010 January: Battery module production began.
2010 January: Began production of electronic paper.
2009 November: Obtained ISO/TS16949:2009 and ISO9001:2008 certifications.
2009 September: Obtained TOSHMS:2007 certification.
2009 February: Started production of automotive products.
2008 November: Began production of FPCA.
2008 October: Started production of power supplies for LED lighting.
2008 September: Obtained OHSAS 18001 (2007 version) certification.
2008 June: Closed Taichung Plant 2.
2008 April: Stopped production at Taichung Plant 2.
2007 March: Began production of inverters.
2006 June: Increased capital to NT$570,500,000.
2006 May: Obtained UL and TUV certification marks.
2005 June: Obtained OHSAS 18001 certification.
2005 May: Established Taichung Plant 2 (for BLU production).
2005 March: Obtained ISO-14001 (2004 version) certification.
2004 April: Started inverter design.
2003 April: Began production of LC-TV BLU.
2001 July: Obtained ISO9001:2000 certification.
2000 February: Obtained ISO14001 certification.
1999 October: Started production of LCD-related components.
1998 August: Relocated hybrid thick film IC (thick film bonding) production entirely to Xiamen Fuji Electric Chemical Co., Ltd.
1997 May: Established sales department.
1997 March: Installed satellite communications system.
1995 October: Renamed Xiamen Fujitsu Electronics Co., Ltd. to Xiamen Fuji Electric Chemical Co., Ltd.
1995 March: Established the technology development department.
1994 June: Obtained ISO9002 certification.
1994 March: Established Xiamen Fujitsu Electronics Co., Ltd.
1991 December: Stopped production of flexible magnetic heads (floppy disks).
1991 March: Stopped production of rigid magnetic heads (hard disks).
1990 November: Closed the Xindian plant.
1990 October: Stopped production of magnetic core memory boards.
1989 July: Increased capital to NT$270,000,000.
1988 November: Established Taoyuan plant and started production of switching power supplies.
1988 October: Increased capital to NT$180,000,000.
1986 August: Approved by the Ministry of Economic Affairs Investment Review Committee, with capital increased to NT$60,000,000.
1986 March: Began production of flexible magnetic heads (floppy disks).
1985 March: Began production of rigid magnetic heads (hard disks).
1985 January: Increased capital to NT$20,000,000.
1983 October: Began production of hybrid thick film ICs.
1981 January: IWAKI Electronics, a 100% subsidiary, started production of magnetic core memory boards (Core Memory) in Xindian City.